April’s column kicked off a series that dove deep into the concept of building automation system (BAS) alarms. That series was supposed to end last month, but in the process of writing those articles, I realized I have more to say on the topic. So here is my victory lap!
The retrofit project provides continuous building-by-building monitoring energy and utility cost analysis inventorying the chilled water flow meters and Btuh energy metering to determine decarbonization results.
The retrofit project provides continuous building-by-building monitoring energy and utility cost analysis inventorying the chilled water flow meters and Btuh energy metering to determine decarbonization results.
If a system was designed to operate in lead/lag, but lead/standby was implemented, it would not be able meet the flow requirements during the highest load periods.
If a system was designed to operate in lead/lag, but lead/standby was implemented, it would not be able meet the flow requirements during the highest load periods.