Eggleston has been with Mestek Inc. for more than 13 years in various capacities advancing through progressively more responsible positions in both product development and sales.
A 52,000-square-foot, seven-story building was transformed from an office facility into 65 one- and two-bedroom rental units. The contractor accomplished this using Stainless Vertical Firetube condensing boilers.
The Near-Boiler Trim Kit comes in premium, advanced and select configurations and is available in 1- and 1 1/4-inch sizes, so installers can select the kit that fits their needs.
"The department ignored a statutory requirement that it establish clear and convincing evidence that the rule results in significant energy savings that outweigh the costs imposed,” said Caroline Davidson-Hood, general counsel, AHRI.