Since data centers are atypical in several aspects, unique BMS approaches are required to optimize their control, monitoring, and operation. Learn why it is important to know the detailed pros and cons between commercial and industrial automation system hardware, software, and instrumentation as you consider the facility’s automation design and associated costs.
In which the author lays out the path from earlier data center design to a more recently discovered airflow challenge. Read on for his insights on how to keep positive differential pressure from being a negative for your facility’s energy budget.
Data center HVAC has come a long way since ’80s-era strategies and even since turn-of-the-century room parameters. Consider that evolution, and how options like economizers and evaporative cooling may be more appealing in light of wider environmental envelopes.
The students have changed, and the way spaces get used is changing as well. How do we need think about educational environments to foster better thinking inside them?
New ideas, regulations, and equipment are making some designs outdated faster than ever. How to take in an ever-evolving landscape, take a deep breath, and provide a data center design to stay proud of? Learn about an integrated VAV approach, the only control point that really matters, and more.
So Charles Dickens, Ferris Bueller, a chicken, and a pig walk into an HVAC article … and try to sort out proper use of outdoor air in data centers. As you might imagine, it’s not simple. But if you remember these three design absolutes and consider your client’s specific perspective, the resulting efficiencies might have you singing Wayne Newton at the prospect of repeat business.
Regulatory, competitive, and environmental
pressures are pushing data centers away from the traditional power sources.
Here, the author surveys the landscape and reviews one comparative study
involving CCP cogeneration and conventional electricity sources. Reducing the
carbon footprint and lessening reliance on a sometimes unreliable grid are just
two reasons to look into CCP.
Forget high-tech or
high-expense fixes for a minute. Have you tried to bump efficiency by looking
for the next aisle over, deploying a
Trim and Respond strategy, or trying the soon-to-be-famous Paper On A Stick approach?
Some of the biggest names in the data center universe think that you plant the
seeds of real savings with some mighty simple steps.