This month's Facility Files will focus on the Back2Basics test addressing the renovation of an existing Metro station with the addition of a new smoke evacuation system located within the building and within the subway’s inbound and outbound tunnels. The associated ADA-compliant elevator will have its own stand-alone, engineered, smoke control, 100 percent outside air fan to a positive-pressurized elevator shaft system.
ValleyPoint Church, a just-completed new-build project, was conceptualized as a place of worship, learning, and gathering for the Glen Mills, Pennsylvania, community.
This month’s Facility File will focus on the B2B December test for the energy retrofit of a commercial office building hot water heating system conversion from a utility company steam system to a new, high-efficiency condensing boiler system.
ASHRAE is seeking a third round of public comments on Guideline 12- 2000R, Proposed Revision of Guideline 12-2000, Managing the Risk of Legionellosis Associated with Building Water Systems.
For many of us involved day to day with the design, installation, and operation of BAS, it often seems like there has been little in terms of new products and innovation.
The technical program has been announced for the 2019 ASHRAE Winter Conference, to be held in Atlanta, Jan. 12–16, at the Omni Hotel Atlanta at CNN Center and the Georgia World Congress Center