DDC application engineers have a brave new world of topics to explore and familiarize themselves with as they intuit what owners really need and deliver designs for the solution.
Designing HVAC systems for large, mixed-use facilities is never easy, but imagine if that design had to meet the diverse needs of both a university and a community center all within the same building.
In May 2017, this column addressed additions to existing BAS. It recommended that most building owners should sole-source these projects using the base-building’s BAS manufacturer.
Sometimes it does pay to sweat the small stuff. Data availability might vary depending simply on where you’re accessing it. Not only selection but placement of your sensors and transmitters can influence their effectiveness and response time. Bearing down on such details on the BMS side can yield long-term results for your cooling goals.
Properly selected automated controls to minimize chiller plant energy, power consumption, and the cost of operations are essential for overarching chiller plant performance.
Generally, when we think about BAS or system integration projects, they are for larger projects such as schools, office buildings, and hospitals that are 50,000 sq ft or larger.