A line reactor is recommended for systems that are connected to a supply transformer with a kVA rating that is greater than 10x the kVA rating of the VFD.
When building owners want their building systems to be designed for resiliency, the discussion between the owner and the engineers typically includes redundancy and temporary HVAC systems that can support all building HVAC systems or portions thereof.