This month’s B2B will focus on a 1,000-kW cogeneration unit with hot water energy recovery to a domestic hot water and process heating system on an existing health care campus. The pre-packaged cogeneration unit shall be located directly outside the central plant electrical room and connected to the existing electrical system.
Prior versions of LEED focused on commissioning the dynamic energy-consuming building systems for confirmation of successful implementation of LEED’s sustainability objectives for each project.
There was a time when HVAC consulting engineering firms had a stand-alone HVAC department with a registered professional engineer as the department head.
“Our VDC team coordinated with Martin Associates through the pre-construction design, working to ensure critical components were successfully integrated into the drawings.
Whether we’re talking a single building or a larger campus, proper strategy for this key HVAC component requires the right team working at the right times. Both physical and fiscal safety may depend on it.