Commissioning professionals should be firm but fair with project teams when representing owners' interests, as the design and construction teams are ultimately responsible for achieving an owner's project requirements.
Commissioning professionals should be firm but fair with project teams when representing owners' interests, as the design and construction teams are ultimately responsible for achieving an owner's project requirements.
With factors such as environmental sustainability, equipment reliability, system performance, and safety top of mind, team administrators quickly converged on Opteon XP10 (R-513A).
March 10, 2022
With factors such as environmental sustainability, equipment reliability, system performance, and safety top of mind, team administrators quickly converged on Opteon XP10 (R-513A).
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.
Existing variable air volume (VAV) and fan-powered air terminals shall be replaced with VAV primary air fan-powered air terminals, operating to provide positive space pressure in the cafeteria and kitchen.
Imagine if you were faced with a project worth tens or hundreds of thousands of dollars that could have been solved with just a couple of hours of work.
Imagine if you were faced with a project worth tens or hundreds of thousands of dollars that could have been solved with just a couple of hours of work.
The more stringent standards found in health care settings, where people are immunocompromised or more vulnerable because of age, need to be extended to other settings.
The more stringent standards found in health care settings, where people are immunocompromised or more vulnerable because of age, need to be extended to other settings.