Process commissioning is not commissioning, according to industry leaders who have worked hard for the past three decades to define and standardize a strong and meaningful process.
Buildings, and their occupants, will benefit greatly if engineers and facility managers opt to live in an immersive, connected world rather than one that's prohibitively capped by the capabilities of Pong.
The existing equipment to remain as part of the condenser water system includes the plate and frame heat exchangers and split-case pumps with standby pumps, each with variable frequency drives (VFDs).
Simplicity and the limited number of HVAC systems within a pharma building make operation, maintenance, and energy conservation performance demanding but easy when compared to health care applications.
It can be really easy to be so caught up in the requirements, specifications, manuals, and drawings that you lose track of what the customer really wants.
Increased acute and chronic inflammation, oxidative stress on target organs, and worsening of underlying pulmonary and cardiovascular disease are some of the verified risks of suboptimal IAQ.