The farm-to-table movement and increased legalization of cannabis have led to a rapid escalation in the quantity and size of grow room facilities throughout the US.
The design, build, and certification process, which would normally take upwards of three years, was completed in just 18 months, despite some pandemic-related delays in material deliveries.
The ratio of the electrical input power of a reference fan to the electrical input power of an actual fan at a given duty point (airflow, pressure, and air density), FEI considers motors and drives, not just fans, which makes it consistent with new efficiency metrics for pumps and air compressors.
Dr. Stephanie Taylor discusses the effectiveness of the Phizer and Moderna vaccines; her latest endeavor, Building4Health; how engineers can best prepare their buildings in the fight against COVID-19; and more.