Just like when you’re working on an engineering project, you need to be concise and accurate with all the information you choose to share and how you present it.
With 120,000 tons of firm capacity, 350 million-plus ton-hours per year of annual load, and a 2020 peak load of 78,600 ton, TECO’s power demand had grown enough to push the plant over the existing CHP’s capacity.
These 13 groundbreaking infrastructure projects and programs represent the latest innovations in transportation, water, and energy infrastructure that are transforming the way engineers plan, build, and adapt to the nation’s infrastructure needs.