This month’s B2B focuses on a new cooling tower to serve a pharmaceutical facility’s new process water system. This tower will be a closed-loop, evaporative condenser to operate 24/7/365.
What began as an inquiry about a single cooling tower replacement at Mooresville, Indiana-based auto parts manufacturer TOA-USA evolved into a multi-building, A-Z design/build project.
HVACR engineering is chock full of barriers. Whether it’s a lack of qualified employees, design challenges, budgetary issues, security concerns, etc., there’s seemingly always something in the way, throttling your progress.
Located in the famed Lambeau Field Stadium District, the award-winning brewer chooses Miura’s on-demand steam for reliable, efficient operation, and green initiatives.
Model ECV-PM, the latest addition to Greenheck’s ECV line, features an AHRI 1060-certified polymer membrane energy recovery core manufactured from corrugated aluminum sheets used to separate the polymer membrane layers.
This month’s Facility File focuses on retrofitting a hospital’s patient floor with the addition of one fan-powered HEPA filter unit per patient room on a 30-patient room floor. The Facility File will focus on the B2B September test to improve the room air-purification environment and to trap particles that are 0.3 microns or larger.