Almost from the start of my HVAC career, I have made it a standard practice to create checklists, use checklists, and continuously improve upon them over the years.
The 60,000-square-foot facility, built on grounds which were acquired in early 2018 by TouchPoint, Inc., the parent company of Southco, has been operational since April of this year.
A university is a lot like a small city, and Montclair State University is no exception. There are 21,000 students enrolled, and more than 5,000 live on-site. The campus has a life of its own, and what keeps everything going is power.
This month’s Facility File focuses on retrofitting a hospital’s patient floor with the addition of one fan-powered HEPA filter unit per patient room on a 30-patient room floor. The Facility File will focus on the B2B September test to improve the room air-purification environment and to trap particles that are 0.3 microns or larger.
Last month I discussed the niche business of troubleshooting and the pertinent things to do in preparation of the data collection, data analysis, and eventually the potential solution(s) plan. This month, I’m going to continue with this topic, focusing on water-side problem solving.