The retrofit project provides continuous building-by-building monitoring energy and utility cost analysis inventorying the chilled water flow meters and Btuh energy metering to determine decarbonization results.
If a system was designed to operate in lead/lag, but lead/standby was implemented, it would not be able meet the flow requirements during the highest load periods.
If a system was designed to operate in lead/lag, but lead/standby was implemented, it would not be able meet the flow requirements during the highest load periods.
The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.
The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.