Several years ago, I wrote book titled Managing People In The HVAC/R Industry, and in it, I dedicated a chapter to those who take on the challenge of being a first-time manager.
Sometimes it’s less important to think outside the box than to notice that the stuff inside the box has changed. In the case of airside economizers, more modern components and seasonal opportunities can make things work swimmingly.
Since opening in November 1929, Northrop Auditorium has served the University of Minnesota as a venue for music, dance, traveling roadshows, and convocations in its auditorium.
A Hilton in the heart of show biz transformed into a sustainable destination hotel with the help of chiller and cooling tower overhauls and improved BAS and ventilation strategies. Don’t miss the final plot twist before the system’s big launch party.
A hotel’s success in the hospitality industry is measured by the quality and value of its guests’ experience, and that requires the hotel to deliver consistently flawless service and reliable comfort at a competitive rate.
This law school design story moves on from rationales for early decisions to the specific next-phase design challenges. Team effort combines with DOAS, radiant ceiling panels, DCV, and setpoint fine-tuning to maintain this case’s appeal.
Perhaps the U.S.’s largest to-date Dedicated Outdoor Air System (DOAS) coupled with radiant ceiling panel (RCP) cooling and heating mechanical system is currently under construction at the Washington College of Law at American University (Washington).