The IPD team, which includes corporate management’s building committee of building managers, the leasing manager, capital projects manager, and facility manager — along with a new corporate BIM manager — will design-construct, operate, and maintain BIM contract document standards for all future capital projects, new and tenant fit-out.
The existing equipment to remain as part of the condenser water system includes the plate and frame heat exchangers and split-case pumps with standby pumps, each with variable frequency drives (VFDs).
Simplicity and the limited number of HVAC systems within a pharma building make operation, maintenance, and energy conservation performance demanding but easy when compared to health care applications.
The design criteria is based on an analytical analysis of existing refrigeration conditions, associated operation, and proactive maintenance management in sync with the hospital’s overall updating the policy and procedure manual as it pertains to refrigerant management and the environment.
The design criteria shall be based on an analytical analysis of existing HVAC conditions, associated operation, and proactive maintenance management in sync with the hospital’s overall needs, updating the policy and procedure manual as it pertains to occupant comfort and IAQ and infection control.
The existing central plants shall provide heating in the winter to maintain 68°F and 76° in the air conditioning season via a single duct, single zone, providing ventilation air and maintaining a positive building pressure of 0.05 inch gage.