Optimization Helps Sustain System Reliability During Growth — with a Payback Ben Erpelding, P.E., C.E.M Scott Johnson, LEED AP April 22, 2021 With 120,000 tons of firm capacity, 350 million-plus ton-hours per year of annual load, and a 2020 peak load of 78,600 ton, TECO’s power demand had grown enough to push the plant over the existing CHP’s capacity.Read More