From addressing temporary fixes of the past to preparing existing cooling for the future, take in these 16 tips for successful projects in high-pressure environments.
Critical facilities have many of the same HVAC demands as other buildings, except the consequences of unexpected problems can be catastrophic and expensive.
Evolving facility needs, revenue-generating special events, in-house labor, the deferred maintenance budget … the factors in a temporary HVAC decision range wider than you might think. So are the opportunities.
Engineers who pull out the 2015 ASHRAE Handbook HVAC Applications or 2016 HVAC System and Equipment Handbook will not find the topic of temporary HVAC systems.
Retrieving every last bit of performance from the system while stopping short of the surge line is no small feat. Dig into sizing, tower selection, chilled water loads and stability, and condenser water management to leave no efficiency stone unturned.
Finding the holy grail of centrifugal chiller optimization for all operating conditions is hard, if not impossible. This article will talk about the requirements of most chiller systems and means of control for condenser optimization.
Two Roads Brewing Company in Stratford, CT, was looking to expand its fast-growing brewery and needed the expertise of an HVACR manufacturer to assist them.